The condition of facade joints determines renewal needs
Facade joints seal the connections between facade elements and accommodate movement caused by temperature changes and structural movement. Weather, sunlight and mechanical stresses gradually weaken the joints.
Zaumax Oy replaces facade joints for housing companies with a planned approach that considers each property's requirements. Timely replacement helps prevent rainwater entering structures through joints and supports long-term facade performance.
Joint condition should be assessed if cracking, loss of adhesion, hardening or other damage is visible. Repeated leaks are also a reason to investigate the joints and facade.
Replacement needs are assessed based on actual joint condition and the building's circumstances. Proactive repairs give the housing company time to plan the scope, schedule and funding.
Silicone joints need regular maintenance
Bathroom and other wet area silicone joints require maintenance and regular condition monitoring. Cracked, detached or persistently darkened joints may need replacement.
Zaumax Oy carries out coordinated silicone joint replacement for housing companies. Combining several apartments into one contract allows efficient arrangements and better cost control.
We carefully remove old silicone joints, prepare bonding surfaces and install suitable new silicone. Special attention is paid to protecting surrounding surfaces and waterproofing.
Residents receive instructions for preparing the room and for drying and reopening after sealing.
Silicone joint replacement is wet area maintenance: it does not replace waterproofing or repair waterproofing damage.
Coordinated work makes daily life easier
An individual apartment's price includes appointments, travel, preparation and invoicing alongside sealing. Separate orders repeat these tasks for each apartment.
In a housing company's shared contract, appointments are planned as a whole and work progresses systematically by floor or stairwell, for example. Invoicing is handled as agreed with one invoice to the housing company.
We agree on work progress, work area arrangements and resident communication with the client. We consider access routes, protection requirements and disruption to residents.
For façade joint replacement, the housing company receives an installation warranty certificate, the material supplier’s warranty certificate for the materials, product information and maintenance instructions. Documentation for other work is agreed as part of the contract.
