Zaumax Oy – Quality doesn't happen by chance
FIENSV
Zaumax project or work site
FOR INDUSTRY

DEMANDING ENVIRONMENT.
A CONTROLLED SOLUTION.

Joint sealing solutions for food facilities, chemical exposure and data centres, plus firestopping for industrial properties. We plan our work stages and material choices around the project requirements and production schedule.

Tell us about your project ↗
INDUSTRY / SERVICES

OPERATING CONDITIONS
GUIDE THE CHOICE.

INDUSTRIAL ENVIRONMENTS

DEMANDING CONDITIONS.
THE RIGHT SOLUTION.

Joint sealing is specified for the use of the premises and actual exposure conditions. Material suitability and the documentation required for the project are confirmed before work begins.

01

Food and process industries

Slaughterhouses, meat processing, dairies, bakeries and beverage production. Material selection takes account of hygiene requirements, cleaning practices and potential food contact.

02

Production and industrial buildings

Workshops and buildings for the metal, wood, pulp and paper industries. Building joint sealing takes account of structural movement, mechanical loading and potential chemical exposure.

03

Logistics and storage

Joint sealing requirements in distribution centres, terminals, cold stores and freezer warehouses. Traffic, operating temperatures and temperature changes are assessed when selecting the solution.

04

Energy and water services

Joint sealing requirements in buildings at power plants, wastewater treatment plants and water facilities. Temperature, moisture and potential chemical exposure are assessed before material selection.

INDUSTRY / DATA CENTRES

CRITICAL FACILITY.
COORDINATED DELIVERY.

Joint sealing and firestopping integrated into controlled data centre delivery. Application requirements, coordinated stages and documented handover in one plan.

Data centre solutions ↗
ZAUMAX / A CONTROLLED WHOLE
01JOINT SEALINGANTISTATIC / ESD REQUIREMENTS
02FIRESTOPPINGDESIGNS / INSPECTIONS
03PROJECT MANAGEMENTPHASING / COORDINATION
04OUR QUALITY PROMISEDOCUMENTATION / HANDOVER
A SHARED DELIVERY PLAN

AROUND PRODUCTION.
PLANNED EXECUTION.

01

Operating environment

Facility use, exposure and cleaning practices.

02

Material suitability

Project requirements and product-specific approvals.

03

Execution phasing

Work areas, interruptions and production schedule agreed with the client.

04

Traceable handover

Materials used, inspections and agreed documentation.

LET'S START WITH THE PROJECT INFORMATION

TELL US ABOUT
YOUR PROJECT.

Tell us the location, how the premises are used and the work needed. Include any known chemical or hygiene requirements and any planned maintenance shutdown.

Request a quote ↗050 435 7378 ↗