Facade project
PUBLIC SECTOR / FACADE JOINT REPLACEMENT

CARING FOR FACADES.
CONSIDERING BUILDING USERS.

Precast panel and facade joint replacement for schools, day care centres, libraries and other public buildings. Planned execution with building users in mind.

Request a replacement quote ↗
SERVICE AT A GLANCE

Your project at a glance

Who it is for
Public property clients and maintenance teams.
What we deliver
Replacement of precast and facade joints in public buildings.
What you receive
An installation warranty certificate, the material supplier’s warranty certificate for the materials, product information and maintenance instructions.
01 / FACADE JOINT REPLACEMENT FOR PUBLIC BUILDINGS

FACADE CONDITION.
PLANNED MAINTENANCE.

Zaumax Oy replaces precast panel and facade joints in schools, day care centres, libraries, offices and other public buildings. We deliver according to project designs, quality requirements and the agreed schedule.

Intact, functional joints protect facade connections from weather and accommodate structural movement. Timely replacement helps prevent rainwater entering structures through joints and supports long-term building maintenance.

02 / JOINT CONDITION AND REPLACEMENT NEEDS

CONDITION GUIDES US.
SCOPE IS DEFINED.

Facade joints are exposed to temperature changes, moisture and sunlight. Over time, sealant may harden, crack or lose adhesion to its bonding surfaces.

Joint condition should be assessed as part of property maintenance planning. Observed damage and any leaks help define the scope of necessary investigations and repairs.

We agree with the client on the areas to be replaced and the scope. If unexpected structures or other repair needs are found, we raise them before continuing the affected work.

03 / PROACTIVE MAINTENANCE

INTACT JOINTS.
PART OF MOISTURE CONTROL.

Rainwater can enter wall structures through damaged facade joints and wet the insulation. Prolonged moisture exposure may damage structures. If there is an air path from damaged structures to occupied rooms, contaminants may enter the indoor air.

Monitoring joint condition and replacing joints in time are therefore important parts of moisture control and proactive maintenance.

04 / PREPARATION AND SEALING SYSTEM

THOROUGH PREPARATION.
SUITABLE MATERIALS.

Durable joint sealing begins with removal of the old sealant and proper preparation of bonding surfaces. Replacement follows the designs and installation instructions for the selected sealing system.

The work takes into account:

  • the condition and cleanliness of bonding surfaces
  • joint dimensions and structural movement
  • backing rods and required primers
  • material compatibility
  • the facade's designed ventilation details
  • weather conditions and material installation requirements.

Before removal, the adequacy of necessary hazardous material surveys is confirmed. Removal methods, protection and waste handling are planned based on the surveys and project requirements.

05 / EXECUTION WITH BUILDING USERS IN MIND

DEFINED WORK AREAS.
SAFE ACCESS ROUTES.

Repairs in public buildings often take place during ongoing use. We plan work area boundaries, access arrangements, lift and scaffold locations and necessary protection with the client.

In schools and day care centres, we pay particular attention to children's movements, outdoor areas and safe entrances. Accessible routes, emergency exits and maintenance traffic are also considered.

Dust, noise and other disruption controls, along with responsibilities for user communication, are agreed before work begins.

06 / SCHEDULING AND COMMUNICATION

ONE STAGE AT A TIME.
AROUND BUILDING USE.

We phase the work by building, facade or other suitable area. Execution can be timed for holidays or other periods suited to the building's operations.

The schedule also allows for weather, work area preparation and inspections. We keep the client informed of progress and raise any required changes early.

07 / QUALITY ASSURANCE AND HANDOVER

QUALITY VERIFIED.
EXECUTION DOCUMENTED.

Our work is guided by Zaumax Oy's own quality manual. Inspections, any sample work and documentation are agreed as part of contract preparation.

The client receives an installation warranty certificate, the material supplier’s warranty certificate for the materials, product information and maintenance instructions. We also provide details of the renewed joints and inspections to the agreed extent. The documentation supports acceptance of the work and future property maintenance.

Explore our quality promise ↗
QUESTIONS AND ANSWERS

GOOD TO KNOW.
BEFORE WORK BEGINS.

How is school or daycare use considered during façade work?

We agree work areas, phasing and user communications with the client. Planning takes account of children’s movements, entrances, accessible routes, escape routes and access equipment placement. Work can be scheduled during holidays, for example, according to project needs.

What does the client receive after façade joint renewal?

The client receives an installation warranty certificate, the material supplier’s warranty certificate for the materials, product information and maintenance instructions. Inspections and other documentation are also agreed according to project requirements.

THE PROPERTY AND ITS USERS

LET'S PLAN THE WORK.
CONTROLLED DELIVERY.

Request a quote for facade joint replacement in a public building — let's plan execution around the property and its users.