Joint sealing for industrial premises where joints are exposed to chemicals, cleaning agents or other aggressive substances. Materials selected for actual operating conditions.
Let’s discuss your project ↗Your project at a glance
- Who it is for
- Industrial property clients and maintenance teams.
- What we deliver
- Joint sealing selected for the operating conditions and chemical exposure.
- What you receive
- Agreed joint sealing work, material information and maintenance guidance for the site.
DEMANDING ENVIRONMENT.
CAREFULLY CHOSEN MATERIALS.
Zaumax Oy seals joints in industrial premises exposed to chemicals, cleaning agents or other aggressive substances. We plan material selection and execution based on actual operating conditions.
Chemical resistance is not a universal material property. Suitability depends on the substance, concentration, temperature and duration and frequency of contact. Careful investigation of these conditions is therefore essential.
SUBSTANCES IDENTIFIED.
SUITABILITY VERIFIED.
We review with the client which substances and conditions the joints will face. Assessment uses chemical safety data sheets, product information and client-provided process and cleaning information.
Material selection takes into account:
- chemicals, their concentrations and possible mixtures
- continuous exposure, repeated splashes or temporary contact
- operating and washing temperatures
- cleaning and disinfection methods
- mechanical loads and structural movement
- surfaces to be sealed and material compatibility.
We verify sealing system suitability using the manufacturer's chemical resistance data and limitations of use. Where needed, we consult the manufacturer's technical support.
THOROUGH PREPARATION.
A FUNCTIONAL JOINT.
A chemically resistant material also needs a correctly designed and installed joint. We consider joint dimensions, bonding surface condition, required pretreatment and primers, and curing conditions.
In replacement work, old sealants are removed within the agreed scope and the substrate is assessed. Any chemical residue or damage affecting adhesion is addressed before new sealant is applied.
AROUND PRODUCTION.
A PLANNED RETURN TO USE.
With the client, we coordinate work with the production schedule, maintenance shutdown or other agreed time. Work area boundaries, protection and sequence are planned according to site safety instructions.
Commissioning allows for the required curing time before chemical exposure, washing or mechanical loading. This provides the planned conditions for the joint's properties to develop.
INFORMATION RECORDED.
CHANGES CONSIDERED.
We provide agreed information on materials, execution and restrictions on use and maintenance. Documentation supports condition monitoring and future maintenance planning.
GOOD TO KNOW.
BEFORE WORK BEGINS.
What information is needed to select a chemically resistant joint seal?
We need details of the chemicals and their concentrations, temperatures, and the duration and frequency of exposure. Cleaning methods, substrates, structural movement and mechanical loading are also assessed. Safety data sheets and the manufacturer’s chemical resistance data support the assessment.
Should the joint sealing solution be reassessed when the process changes?
Yes, if chemicals, concentrations, cleaning methods or temperatures change, for example. The previous assessment may not cover the new conditions. Material suitability is checked against the manufacturer’s limitations and, where necessary, with technical support.
REVIEW THE CONDITIONS.
MAKE THE RIGHT CHOICE.
Contact us to establish your project's chemical exposure and a suitable sealing solution. Chemical details, concentrations and operating conditions help us get started.
Request a quote ↗Our quality promise ↗